PLAN FOR SUCCESS

Design-Build is a method of project delivery in which one entity – the design build team – works under a single contract with the project owner to provide design and construction services. Re-integrating the roles of the designer and constructor results in one entity, one contract, one unified flow of work from initial concept through completion.

Kinco is experienced in with the design-build delivery method. The pros to design-build are:

Singular Responsibility

With both design and construction in the hands of a single entity, there is a single point of responsibility for quality, cost, and schedule adherence. The design-builder is motivated to deliver a successful project by fulfilling multiple parallel objectives, including aesthetic and functional quality, budget, and schedule for timely completion. With design-build, the owner is able to focus on scope/needs definition and timely decision making, rather than on coordination between designer and builder.

Quality

The singularized responsibility inherent in design-build serves as a motivation for quality and proper project performance. The owner’s requirements and expectations are documented in performance terms and it is design-build entity’s responsibility to produce results accordingly. The design-builder warrants to the owner that it will produce design documents that are complete and free from error. During the construction process this attention to quality does not end, as the designer becomes the master builder, and manages the construction of the project to completion.

Cost Savings

Design and construction personnel, working and communicating as a team, evaluate alternative materials and methods effectively and accurately. Value engineering and constructability are utilized continuously and more effectively when the designers and contractors work as a team during the entire design process.

Time Savings

Because design and construction are overlapped, and because bidding periods and redesign are eliminated, total design and construction time can be significantly reduced. With design-build, material and equipment procurement and construction work can begin before the construction documents are fully completed. The resulting time savings translates into lower costs and earlier utilization of the completed facility.

Reduced Administrative Burden

During procurement, the potential exists for design-build to reduce the owners administrative burden. During actual design and construction, the owner is not required to invest time and money in coordinating and arbitrating between separate design and construction contacts, but rather is able to focus on timely decision making.

Early Knowledge of Construction Costs

Construction costs are known far earlier than in other delivery systems. The entity responsible for design is simultaneously estimating construction costs and can accurately conceptualize the completed project. Staged contracting for design-build services affords the owner one or more “go, no-go” decision points during design. The decision to proceed with the project is made before substantial design expenditure and with knowledge of final project cost.

Improved Risk Management

Performance aspects of cost, schedule and quality are clearly defined and responsibilities/risks are appropriately balanced (individual risks are managed by the party best positioned to manage that risk). Change orders due to “errors and omissions” are virtually eliminated, because the design-builder had responsibility for developing drawings and specifications as well as constructing a fully-functioning facility.

All projects are different and the best delivery method for each project is unique to that project. Kinco has experience with all delivery methods and we are happy to provide consultation as you decide which delivery method is best for your specific project.